Approval Date | 22 Nov 1974 |
Signature Date | 08 Dec 1974 |
Planned Completion Date | 15 Apr 1978 |
Last Disbursement Planned Date | 15 Apr 1978 |
Sovereign / Non-Sovereign | Sovereign |
Sector | Power |
DAC Sector Code | 23260 |
Commitment | U.A 5,000,000 |
Status | Completion |
The major part of the project consists of intalling new power plant for the city of port Said. The plant will be equipped with two gas turbines each of a maximum rating of 23.45 MW. Each turbine will be delivered with its generator, transformer as well as complete set of accessoiries. The manufacturer will be asked to erect each set on a base plate and with the necessary encasement in such a way that the only civil works to be done in Port Said will be the building of the foundation for the placement of the units. In addition, a small building has to be constructed for equipment control and for the switching panel which will connect the new units with the existing 11 KV distribution network in the city.
Funding
African Development Bank
|
Implementing
Egyptian Electricity Authority
|
IATI identifier | 46002-P-EG-FAA-001 |
Last Update | 27 Mar 2023 |
Name | FIKRU Bizuneh |
Country | Egypt |