Shoubrah El Kheima Electrification Iv


Project Summary

Approval Date 28 Aug 1985
Signature Date 10 Mar 1986
Planned Completion Date 31 Dec 1994
Last Disbursement Planned Date 31 Dec 1994
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23020
Commitment U.A 36,037,053.49
Status Completion

Project General Description

The present intervention relates to the Shoubrah El Kheima Power Station Unit 4 Project. It comprises the expansion of the Shoubrah El Kheima Power Station by adding a fourth 315 MW generating set, effecting the necessary rearrangements within the boundaries previously established for the first three sets and constructing the extra electrical circuits necessary to carry the additional output from the power station to a nearby main transformer sub-station. The project should help meet the power shortfall in the years beginning from 1987 and increase the reliability of supply in cairo zone. This should permit duplication of the design engineering to the greatest possible extent maintain project continuity, ease station operability and reduce risks.

Project Objectives

The basic objective of the project is to economically meet part of the power shortfall in Egypt's Unified Power System by reaching about 400 MW or 6% of the total peak demand in 1986/87.

Beneficiaries

The final beneficiaries of the project are the egyptian population.

Participating Organization

Funding
African Development Bank
Implementing
Egyptian Electricity Authority (EEA)