Mali – Etude d’un Programme de Réhabilitation et de Développement des Systèmes d’Approvisionnement en Eau Potable et d’Assainissement dans la Région de Ségou


Project Summary

Approval Date 06 May 1998
Signature Date 28 May 1998
Planned Completion Date 31 Dec 2004
Last Disbursement Planned Date 31 Dec 2004
Sovereign / Non-Sovereign Sovereign
Sector Water Supply & Sanitation
DAC Sector Code 14010
Commitment U.A 662,748.89
Status Completion

Project General Description

The present intervention concerns the Study of a Rehabilitation and Development Programme for Drinking Water Supply and Sanitation Systems in the Segou Region. It is designed by the Government of Mali with the support of the African Development Bank Group. This study should be conducted in two phases and last sixteen (16) months. The first stage of the study concerns the rehabilitation and strengthening of village drinking water supply infrastructures in the seven (7) circles that make up the Region: Barouéli, Bra, Macina, Niono, San, Ségou and Tominian. The second stage of the Study concerns the supply of drinking water and sanitation, in semi-urban centres such as Barouéli, Dioro, Konobougou, Macina, Niono and Bla (in sanitation).

Participating Organization

Funding
African Development Fund
Implementing
MINISTERE DU DEVELOPPEMENT RURAL ET DE L'EAU

Information

IATI identifier 46002-P-ML-EA0-003
Last Update 27 Sep 2020

Export

Contact Details

Geographic Location

Country Mali