Approval Date | 24 Jun 1975 |
Signature Date | 08 Aug 1975 |
Planned Completion Date | 31 Dec 1979 |
Last Disbursement Planned Date | 31 Dec 1979 |
Sovereign / Non-Sovereign | Sovereign |
Sector | Power |
DAC Sector Code | 23630 |
Commitment | U.A 5,000,000 |
Status | Completion |
The phase I for which Bank assistance is being requested, consists of: (i) The construction of 132 kV transmission line 290 km long, from Nkula Falls via Salima to Lilongwe ; (ii) Building of the transformer/switching stations at Nkula and Lilongwe, equipped with necessary switchgear and protection equipment. Phase II of the proposed 132 kV line Nkula Falls/Salima line to Chinteche, a distance of 251 km; (ii) Building transformer/switching stations at Salima and Chinteche, equipped with necessary switchgear and protection equipment.
Funding
African Development Bank
|
Implementing
ELECTRICITY SUPPLY COMMISSION OF MALAWI
|
IATI identifier | 46002-P-MW-FAC-001 |
Last Update | 01 Feb 2023 |
Country | Malawi |