Approval Date | 07 Feb 2019 |
Signature Date | 15 May 2019 |
Planned Completion Date | 31 Dec 2023 |
Sovereign / Non-Sovereign | Sovereign |
Sector | Transport |
DAC Sector Code | 21012 |
Commitment | U.A 1,200,000 |
Status | Implementation |
This intervention focuses on Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies. This is a priority project for the state of Abia and the Federal Government of Nigeria. These studies will facilitate the assessment of the feasibility, detailed engineering design, and preparation of tender documents for the execution of the roads, solid waste management, and the gully erosion works components of the Abia State Integrated Infrastructure Development Project. The expected outputs of the study will include; (i) feasibility study reports, (ii) detailed engineering design reports that cover design, soils/materials investigation, hydrologic/hydraulic design, environmental and social impact assessment (ESMP), drawings, specifications, and bidding documents for the execution of the various roads, and solid waste management components of the project.
The objective of the project is to undertake feasibility studies, detailed engineering design, and preparation of tender documents for the priority roads, together with storm water drainage, and waste management components of the project.
The main beneficiaries are the State of Abia and the Federal Republic of Nigeria.
Funding
Middle Income Countries Fund
|
IATI identifier | 46002-P-NG-D00-011 |
Last Update | 01 Feb 2023 |
Name | MUSA Patrick Tamba |
p.musa@afdb.org |