Nigeria - Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies


Project Summary

Approval Date 07 Feb 2019
Signature Date 15 May 2019
Planned Completion Date 31 Dec 2021
Last Disbursement Planned Date 31 Dec 2021
Sovereign / Non-Sovereign Sovereign
Sector Transport
DAC Sector Code 21010
Commitment U.A 1,200,000
Status Implementation

Project General Description

This intervention focuses on Abia State Integrated Infrastructure Development Project (ABSIIDP) Preparation Studies. This is a priority project for the state of Abia and the Federal Government of Nigeria. These studies will facilitate the assessment of the feasibility, detailed engineering design, and preparation of tender documents for the execution of the roads, solid waste management, and the gully erosion works components of the Abia State Integrated Infrastructure Development Project. The expected outputs of the study will include; (i) feasibility study reports, (ii) detailed engineering design reports that cover design, soils/materials investigation, hydrologic/hydraulic design, environmental and social impact assessment (ESMP), drawings, specifications, and bidding documents for the execution of the various roads, and solid waste management components of the project.

Project Objectives

The objective of the project is to undertake feasibility studies, detailed engineering design, and preparation of tender documents for the priority roads, together with storm water drainage, and waste management components of the project.

Beneficiaries

The main beneficiaries are the State of Abia and the Federal Republic of Nigeria.

Participating Organization

Funding
Middle Income Countries Fund

Information

IATI identifier 46002-P-NG-D00-011
Last Update 31 Oct 2019

Export

Contact Details

Name MUSA Patrick Tamba
Email p.musa@afdb.org

Geographic Location

Country Nigeria