Nigeria Liquified Natural Gas


Project Summary

Approval Date 20 Nov 2002
Signature Date 18 Dec 2002
Sovereign / Non-Sovereign Non Sovereign
Sector Power
DAC Sector Code 23340
Commitment U.A 65,185,648.73
Status Completion

Project General Description

The present project is the third expansion phase of Nigeria Liquefied Natural Gas (NLNG)’s LNG plant located in Finima on Bonny Island, approximately 40 km south of Port Harcourt, on the eastern part of the Niger River delta (the Niger Delta). The project, known as NLNGPlus Project (Trains 4 and 5 plus associated facilities), should produce LNG for sale on the international markets. The NLNGPlus Project consists of the construction and operation of two additional air-cooled LNG Trains (4 and 5) capable of processing 1.334 million standard cubic feet per day (mscfd) of gas, bringing the total number to five Trains with an overall capacity of 2.810 mscfd gas intake. Specifically, the NLNGPlus Project (Trains 4 and 5 plus associated facilities) should increase LNG production capacity by 92%, from 8.7 mtpa to 16.7 mtpa, condensate capacity by 120% from 0.5 mtpa to 1.1mtpa, and LPG capacity by 83% from 1.2 mtpa to 2.2 mtpa.

Project Objectives

The purpose of the project is to (i) capture the gas flares in Nigeria to increase the LNG production, (ii) exploit the associated oil-gas, and (iii) implement an air-cooling design instead of the water-cooling process used for the existing Trains.

Beneficiaries

The main beneficiaries of the project are the Nigeria Liquefied Natural Gas (NLNG) Limited, the local communities in the project area as well as the entire population of Nigeria.

Participating Organization

Funding
African Development Bank

Information

IATI identifier 46002-P-NG-FD0-001
Last Update 19 Oct 2020

Export

Contact Details

Email private-sector@afdb.org

Geographic Location

Country Nigeria