Approval Date | 11 Jun 2008 |
Signature Date | 22 Oct 2008 |
Planned Completion Date | 30 Jun 2017 |
Last Disbursement Planned Date | 31 Dec 2016 |
Sovereign / Non-Sovereign | Sovereign |
Sector | Transport |
DAC Sector Code | 21023 |
Environmental Category | 2 |
Commitment | U.A 139,476,273.91 |
Status | Completion |
The Road Project V is consistent with the pursuance of the strategy to upgrade the Transport Sector, formulated by the Government since the previous five-year Development Plans aimed at promoting an efficient high quality transport system. The project is part of the investments planned for road infrastructure under the 11th Plan (2007-2011) and its implementation is in line with the Bank's intervention strategy in Tunisia for the period concerned. It was designed to address the capacity constraints (width of carriageways and their structural condition) of the classified road network which does not at present provide an acceptable level of service in respect of traffic volumes and the rapid growth of heavy traffic, which is responsible for the deterioration of the carriageway structures and a heightened risk of accidents. The project involves carrying out work with the following components: (i) structural road works (diversion of the cities of Beja, Jendouba, Sidi Bouzid, M'Saken-Est in Sousse and El Hamma in Gabès and modernisation by upgrading the GP6D sections in Beja, the GP2 between Enfida and Kairouan and GP3 -Fahs in Zaghouan); (ii) rehabilitation of a total of 374.1 km of paved roads; (iii) reinforcement of a total of 640.4 km of paved roads; (iv) construction of 14 engineering structures distributed over the classified road network. The implementation of the project will contribute to safeguarding the existing road network, while improving the state of the infrastructure, thereby fostering intra- and inter-regional trade and reducing regional disparities. This will result in greater complementarity of road transport with the other modes of transport, and contribute to enhancing the competitiveness of the country by lowering transport costs. The estimated cost of the project is UA 264.15 million, equivalent to US$ 399 million (Tunisian dinars 474.82 million).
The project aims to improve the level of service of the classified road network with a view to intensifying intra-and inter-regional trade and improving the accessibility of the country’s principal development poles.
The present project will benefit the whole country’s population, particularly the inhabitants of the north-west (Beja, Jendouba, Kef and Siliana), centre (Sousse, Mahdia, Monastir et Kairouan et Sidi Bouzid) and the south-west (Gabes et Medenine) where inadequate basic infrastructure, particularly roads, in the Governorates of Sidi Bouzid, Siliana et Kasserine and certain regions of the south has been the cause of a slower rate of socioeconomic development in relation to coastal areas.
Funding
African Development Bank
|
Extending
Government Of Tunisia
|
Implementing
MINISTERE DE L'EQUIPEMENT ET DE L'HABITAT
|
IATI identifier | 46002-P-TN-DB0-009 |
Last Update | 22 Mar 2023 |
Name | Papa Mamadou FALL |
p.fall@afdb.org |
Country | Tunisia |
Coordinates | Location Name |
---|---|
36.9833 10.1167 | Gouvernorat de Ariana |
36.66667 9.25 | Gouvernorat de Béja |
36.63333 10.25 | Gouvernorat de Ben Arous |
37.08333 9.58333 | Gouvernorat de Bizerte |
33.83333 9.75 | Gouvernorat de Gabes |
36.66667 8.75 | Gouvernorat de Jendouba |
35.58333 9.83333 | Gouvernorat de Kairouan |
36.08333 8.75 | Gouvernorat de Kef |
36.8333 9.83333 | Gouvernorat de la Manouba |
33.33333 11 | Gouvernorat de Médenine |