Multinational - Mozambique - Zambia 400KV Power Interconnector Project


Project Summary

Approval Date 06 Dec 2016
Signature Date 14 Mar 2017
Planned Completion Date 30 Dec 2021
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23220
Environmental Category 1
Commitment U.A 1,362,143.87
Status Implementation

Project General Description

The Mozambique - Zambia 400KV Power Interconnector Project consists of a high voltage transmission line from Chipata 330/132/33 kV substation to the Cataxa substation in Mozambique as well as the construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje. The project directly support the African Union’s Programme for Infrastructure Development in Africa (PIDA), especially North-South Power Transmission Corridor. The Mozambique–Zambia Interconnector project will go a long way to mitigate the congestion in the SAPP network. The NEPAD-IPPF grants are to help fund full feasibility studies, including detailed design and tender documents of the proposed high-voltage direct current (HVDC) 330-/400-kV transmission lines within two years. This support includes one component consisting of the following sub components: • Feasibility Study, Detailed Design, Tender Documents and Terms of References for supervision consultant; • Environmental and Social Impact Assessment (ESIA); and • Resettlement Action Plan (RAP).

Project Objectives

The objective of the project is to enable the evacuation of power from Cahora Bassa Hydro Power Station through Zambia to the Southern Africa electricity market.

Beneficiaries

The project will increase the transmission capacity within the SAPP as well as enhance energy security for the Mozambique and Zambia. In addition to reinforcing and building resilience in the current grid, the interconnectors will significantly help to increase trade flows, deepen power trading markets in the region and in Africa as a whole. The interconnectors will help to create an enabling environment for private-sector participation by assuring a ready regional offtake of power generated.

Participating Organization

Funding
NEPAD Infrastructure Project Preparation Facility
Implementing
Southern Africa Power Pool (SAPP)

Information

IATI identifier 46002-P-Z1-F00-066
Last Update 02 Oct 2022

Export

Contact Details

Name CARVALHO DE MELO Epifanio
Email e.carvalhodemelo@afdb.org

Geographic Location

Country Multinational
Coordinates Location Name
-13.23251 30.23522 Serenje
-14.33333 28.5 Zambia
-18.25 35 Mozambique