Multinational - Ethiopia-Sudan Power System Interconnexion Study


Project Summary

Approval Date 02 Oct 1992
Signature Date 07 Jan 1993
Planned Completion Date 31 Dec 1995
Last Disbursement Planned Date 31 Jan 1995
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23630
Commitment U.A 546,126.25
Status Completion

Project Objectives

The objectives of the study are : 1) To investigate the feasibility of transmitting the Ethiopian hydropower surplus for replacing the thermal generation in the Sudan, thereby the countries share the benefits thus generated (savings in fuel and spare parts as a result of replacing thermal generation in the Sudan by Ethiopian hydropower). 2. To design cost effective electrical network of acceptable reliability and environmental impacts for interconnecting the power systems of Ethiopia and the Sudan towards the optimal operation of the two power systems.

Participating Organization

Funding
African Development Fund
Extending
Government
Implementing
Ethiopian Electric Power Corporation

Information

IATI identifier 46002-P-Z1-FAC-002
Last Update 02 Oct 2022

Export

Contact Details

Geographic Location

Country Multinational