Multinational - Baynes Hydro Power Project 400 KV Transmission


Project Summary

Approval Date 14 Oct 2020
Signature Date 28 Jun 2022
Planned Completion Date 30 Dec 2024
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23630
Environmental Category 3
Commitment U.A 1,181,370.41
Status Implementation

Project General Description

The proposed operation concerns a grant not exceeding US$ 1,568,600 to Southern African Power Pool (SAPP) on behalf of the national power utilities, RNT and NamPower for the purpose of conducting the pre-investment techno-economic studies of the Baynes Hydro Power 400 kV Transmission Lines Project. The Baynes Hydro-Power Plant (HPP) on the Kunene (Cunene) River between Namibia and Angola will have an installed capacity of 600 MW, with 300 MW allocated to Namibia and 300 MW allocated to Angola. The project directly integrates into the Angola – Namibia (ANNA) regional interconnector project, interconnecting Angola to the SAPP. This will be a green-field project. Technical studies for the transmission lines and associated substations are essential for the evacuation of power from the Baynes HPP which has Feasibility Studies that are almost complete. Strategically, the implementation and realisation of the project will promote regional cooperation for development and optimal utilisation of energy resources within the sub-region. Further, specifically in this case, this regional project will influence the implementation of the least-cost projects and coordination of this regional investment will involve significant savings in NPV terms for the region. The project will help deliver both physical (Interconnector and associated hardware) and institutional (agreements, rules, harmonized grid-codes, processes, skills, power trade, etc.) infrastructure. The total implementation period is estimated to Twenty-four months (24) from approval comprising eighteen (18) months for conducting the studies, holding validation workshops and compiling reports preceded by six (6) months for the procurement process including negotiation and contract award.

Project Objectives

The project objective is to conduct Technical, Economic and Environmental Studies for 400 kV transmission lines and substations for the evacuation of power from the proposed 600 MW Baynes Hydro Power Project (HPP) on the Cunene (Kunene) River, bordering Angola and Namibia, integrating into existing power transmission grids of the two (2) countries; specifically: (i) Undertake technical studies and compose technical design specifications of transmission lines, substations and associated auxiliary or ancillary equipment and systems; (ii) Assess the commercial and financial (economic) viability of the entire transmission project through to project structuring and bankability; (iii) Prepare Specifications, Designs and Tender Documents; and, (iv) Prepare Project Information Memorandum (PIM) for the transmission lines and associated substations.

Beneficiaries

The Beneficiary of this grant will be SAPP on behalf of the two involved Governments (Angola and Nambia) and the two utilities (RNT and NamPower).

Participating Organization

Funding
NEPAD Infrastructure Project Preparation Facility
Extending
Government
Implementing
SOUTHERN AFRICAN POWER POOL PROJECT ADVISORY UNIT (SAPP-PAU)

Information

IATI identifier 46002-P-Z1-FAD-021
Last Update 09 Dec 2022

Export

Contact Details

Name CARVALHO DE MELO Epifanio
Email e.carvalhodemelo@afdb.org

Geographic Location

Country Multinational
Coordinates Location Name
-19.4167 13.75 Kunene