South Africa - Eskom Transmission Improvement Project - Loan


Project Summary

Approval Date 25 Sep 2018
Signature Date 27 Nov 2018
Planned Completion Date 30 Jun 2022
Last Disbursement Planned Date 30 Jun 2022
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23010
Commitment U.A 138,392,043.66
Status Implementation

Project General Description

Eskom’s transmission development plan (2016–2025) prioritises the integration of power stations developed by Eskom and independent power producers (IPPs) to the network. The plan is further broken down into a five-year (2016–2020) strategic plan to construct 2,958km of power delivery lines and 29,240MVA of substations. Significant lengths of new transmission lines and associated substations and substation equipment are being added to the system necessitated by the major 765kV network reinforcements required for electricity supply to the Cape and KwaZulu-Natal regions.

Project Objectives

This project involves the construction of 436km of 400kV and 116km of 132kV transmission lines and associated substation work in KwaZulu-Natal and Mpumalanga province and upgrading of substation equipment and improvement of various substation earth mats in Mpumalanga province. The lines are required to (i) provide additional power evacuation paths for new generation capacity, (ii) ensure the availability of capacity for future load growth, (iii) reduction of network losses; and (iv) safety during network operations to ensure compliance to the Grid Code.

Beneficiaries

The project comprises the construction of transmission lines and the rehabilitation of substations in Mpumalanga and Kwazulu-Natal (KZN) provinces. The outcome is increased availability of electricity supply and improved efficiency of the power transmission system through a reduction in the level of technical losses. The project output will thus benefit all electricity customers connected to the grid in South Africa and the region but will mainly benefit the Cape and Kwazulu-Natal regions, as the project creates additional power evacuation paths for power generated in Mpumalanga and Drakensburg areas, respectively. As of 2015, the Cape and KZN provinces accounted for 46 percent of the South African population at just over 24.7 million (51 percent female and 49 percent male).

Participating Organization

Funding
African Development Bank
Implementing
ESKOM HOLDINGS LTD (Public Sector client)

Information

IATI identifier 46002-P-ZA-FA0-003
Last Update 31 Oct 2019