46002-P-Z1-FC0-008 Multinational Power Sovereign Uganda - Tanzania oil pipeline products study 1,257,972 Cancelled 25 Aug 2015
46002-P-Z1-FC0-006 Multinational Power Sovereign Multinational - Kigali/Bujumbura oil products pipeline feasability study 432,144 Cancelled 24 Oct 2014
46002-P-ZA-F00-004 South Africa Power Sovereign South Africa - Eskom Renewable Energy Project 143,408,427 Cancelled 30 May 2011
46002-P-GN-F00-004 Guinea Power Sovereign Guinea - Rural Electrification Project 14,960,000 Cancelled 21 Jan 2011
46002-P-Z1-F00-035 Multinational Power Sovereign Assistance à l'omvg pour la Realisation de Son Programme Energie e Sous Forme de Ppp 521,485 Cancelled 18 Apr 2007
46002-P-BJ-F00-005 Benin Power Sovereign Etude du Programme Electrification Rurale 666,637 Cancelled 12 Nov 1997
46002-P-LS-FAB-001 Lesotho Power Sovereign Muela Hydro-Power Project (Adb/Adf/Taf) 505,997 Cancelled 01 Dec 1992
46002-P-ZR-FA0-003 Ex Zaire Power Sovereign Electricite Iv 64,460,000 Cancelled 12 Jun 1989
46002-P-ZR-FAB-001 Ex Zaire Power Sovereign Projet électrification 3 (Centrale hydroélectrique de Katende) 17,260,648 Cancelled 18 Dec 1986
46002-P-GQ-FA0-001 Equatorial Guinea Power Sovereign Etude Electrification de 10 Villes 349,296 Cancelled 22 Jan 1985