XLSX  
IATI identifier Country Sector Sovereign / Non-Sovereign Title Commitment in UA Status Approval Date
46002-P-EG-F00-002 Egypt Power Sovereign Improv. Oper. Eff. Exist. Power Plants 490,400 Completion 16 May 2011
46002-P-EG-FE0-004 Egypt Power Sovereign Studying Integration Wind Power 494,000 Completion 16 May 2011
46002-P-RW-FG0-001 Rwanda Power Non Sovereign Rwanda - (Loan to KivuWatt Limited) - Lake Kivu Integrated Methane Gas Extraction and Power Production Facility 17,552,974 Implementation 03 Feb 2011
46002-P-GN-F00-004 Guinea Power Sovereign Guinea - Rural Electrification Project 14,960,000 Completion 21 Jan 2011
46002-P-Z1-FA0-029 Multinational Power Sovereign Multinational - Guinea-Mali Electricity Interconnection Study 2,480,255 Completion 12 Jan 2011
46002-P-CD-FA0-003 Congo, the Democratic Republic of the Power Sovereign Democratic Republic of Congo - Semi-Urban and Rural Electrification Project 69,690,000 Implementation 15 Dec 2010
46002-P-EG-FAA-016 Egypt Power Sovereign Egypt - Suez 650 MW Steam Cycle Thermal Power Plant Project 282,902,171 Completion 15 Dec 2010
46002-P-ET-FA0-008 Ethiopia Power Sovereign Ethiopia - Electricity Transmission System Improvement Project 148,156,558 Completion 06 Dec 2010
46002-P-KE-FA0-004 Kenya Power Sovereign Kenya - Power Transmission System Improvement Project 43,648,387 Completion 06 Dec 2010
46002-P-TZ-FA0-009 Tanzania, United Republic of Power Sovereign Tanzania - Iringa-Shinyanga Transmission Line Project 85,691,561 Completion 26 Oct 2010
46002-P-SL-F00-005 Sierra Leone Power Sovereign Sierra Leone - The Bumbuna Hydroelectric Project 697,291 Completion 29 Sep 2010
46002-P-CM-FA0-003 Cameroon Power Sovereign Cameroon - Project to Strengthen and Extend the Electricity Transmission and Distribution Networks 51,238,951 Implementation 15 Sep 2010
46002-P-Z1-FAD-003 Multinational Power Sovereign Multinational - Ethiopia-Kenya Power Interconnection: Phase II 651,856 Completion 15 Jul 2010
46002-P-BF-FA0-006 Burkina Faso Power Sovereign Burkina Faso - Electricity Infrastructure Strengthening and Rural Electrification Project 24,521,638 Completion 07 Jul 2010
46002-P-Z1-FA0-032 Multinational Power Sovereign Multinational - Supplementary Loan to Kenya for the Kenyan Section of Interconnection Project of Electric Grids of Nile Equatorial Lakes Countries (Amendment to Resolution N° F/Z1/2008/36) (Amount Revised) 21,416,407 Completion 16 Jun 2010